Traffic is moving on a 6-lane dual carriageway road. Traffic volume per direction during peak hour (08:00 am to 09:00 am) is 6000 veh/h. It is assumed that the traffic is distributed uniformly across the lanes in each direction. Just at 08:00 am, a truck goes out of order on the middle lane of one side, thus disrupting the traffic on that lane in one direction. The lane capacity under normal conditions is 2000 veh/h/ln and under queue formation it is 1600 veh/h/ln. The traffic resumes at 08:30 am on removing the truck from the middle lane. Hourly traffic volume after 09:00 am reduces to 5000 veh/h/dir.
The number of vehicles in the queue at 10:00 am is ______ (in integer).
GATE CE 2026 (S1) — Question 60
Traffic EngineeringTraffic studies on flow and speed, peak hour factor, accident study, statistical analysis of traffic dataNAT2 marksHard
A GATE question every morning
One real past-paper question every morning for your branch, answer hidden until you tap. Free on Telegram.
More on Traffic studies on flow and speed, peak hour factor, accident study, statistical analysis of traffic data
- GATE CE 2026 (S2) · Q23An incident occurred on one side of a median on a four-lane dual carriageway road section. This incident disrupted the traffic movement in…
- GATE CE 2026 (S2) · Q34A downgrade of 1 in 100 meets an upgrade of 1 in 125 on a road. If the rate of change of grade is 0.10 % per 30 m, the length (in m) of the…
- GATE CE 2026 (S2) · Q61A vertical curve is formed by a descending gradient of 1 in 40 meeting an ascending gradient of 1 in 50. Consider the following: Stopping S…
- GATE CE 2026 (S1) · Q33The travel times of three vehicles on a 2 km stretch of road are 4, 5, and 8 minutes. Assuming the speed of each vehicle to be constant in…
- GATE CE 2025 (S2) · Q20The point where the road alignment changes from a tangent to a curve is known as .
- GATE CE 2025 (S2) · Q64On a two-lane highway, a horizontal curve of radius 300 m is provided. The design speed is 80 km/h. If the longest wheelbase of vehicle exp…

