GATE EE 2025 — Question 64

Power SystemsEconomic Load Dispatch (with and without considering transmission losses)NAT2 marksMedium

Two units, rated at 100 MW and 150 MW, are enabled for economic load dispatch. When the overall incremental cost is 10,000 Rs./MWh, the units are dispatched to 50 MW and 80 MW respectively. At an overall incremental cost of 10,600 Rs./MWh, the power output of the units are 80 MW and 92 MW, respectively. The total plant MW-output (without overloading any unit) at an overall incremental cost of 11,800 Rs./MWh is ________ (round off to the nearest integer).
Practise the full 2025 paper
Challenge a friend: WhatsApp Telegram
From RENYXERAFree All-India Mock — every SundayA full GATE CS paper, exactly 180 minutes, ranked across India with your GATE score.
Practise more on Economic Load Dispatch (with and without considering transmission losses)Timed, in the real exam interface · free to start

A GATE question every morning

One real past-paper question every morning for your branch, answer hidden until you tap. Free on Telegram.

Join
Stuck? Ask in the student group