Two units, rated at 100 MW and 150 MW, are enabled for economic load dispatch. When the overall incremental cost is 10,000 Rs./MWh, the units are dispatched to 50 MW and 80 MW respectively. At an overall incremental cost of 10,600 Rs./MWh, the power output of the units are 80 MW and 92 MW, respectively. The total plant MW-output (without overloading any unit) at an overall incremental cost of 11,800 Rs./MWh is ________ (round off to the nearest integer).
GATE EE 2025 — Question 64
Power SystemsEconomic Load Dispatch (with and without considering transmission losses)NAT2 marksMedium
A GATE question every morning
One real past-paper question every morning for your branch, answer hidden until you tap. Free on Telegram.
More on Economic Load Dispatch (with and without considering transmission losses)
- GATE EE 2026 · Q58A system with two generators G1 and G2 (without generator limits) is shown. The total load on the system is 1184 MW. The expressions for th…
- GATE EE 2024 · Q34The incremental cost curves of two generators (Gen A and Gen B) in a plant supplying a common load are shown in the figure. If the incremen…
- GATE EE 2023 · Q21The expressions of fuel cost of two thermal generating units as a function of the respective power generation P G1 and P G2 are given as F…
- GATE EE 2022 · Q43The fuel cost functions in rupees/hour for two 600 MW thermal power plants are given by Plant 1: C 1 = 350 + 6P 1 + 0.004P 1 2 Plant 2: C 2…
- GATE EE 2021 · Q20Two generators have cost functions F 1 and F 2. Their incremental-cost characteristics are dF 1 dP 1 = 40 + 0.2P 1 dF 2 dP 2 = 32 + 0.4P 2…